VolcMiner D1 Hydro for sale
The VolcMiner D1 Hydro redefines performance and efficiency in cryptocurrency mining. Designed specifically for Scrypt-based algorithms, this high-end miner is optimized for mining Litecoin (LTC) and Dogecoin (DOGE). With a remarkable hashrate of 30.4 GH/s and power consumption of 7600W, the D1 Hydro is engineered to deliver maximum returns for professional mining operations.
What truly sets the VolcMiner D1 Hydro apart is its state-of-the-art hydro-cooling system. Unlike traditional air-cooled miners, the hydro-cooling technology ensures that heat is effectively managed, even during peak performance. This innovation not only enhances system stability but also significantly prolongs the lifespan of the machine, making it a reliable option for long-term operations. Moreover, the quieter operation of hydro-cooled systems offers a more pleasant mining environment, especially when compared to the noisy alternatives in the market.
Energy efficiency is another standout feature of the D1 Hydro. It achieves an energy efficiency of 0.25 J/MH, which is among the best in the industry for Scrypt-based miners. With electricity being one of the most substantial costs in mining, this level of efficiency makes the D1 Hydro highly cost-effective. Miners can achieve greater profitability by reducing energy consumption without compromising on performance.
The design of the VolcMiner D1 Hydro is geared toward user convenience and adaptability. Its 2U rack-mounted format allows for easy integration into existing mining setups, ensuring scalability for those operating multiple units. Additionally, the Ethernet connection ensures stable and high-speed network access, a critical factor in maintaining uninterrupted mining activity. These thoughtful design elements make the VolcMiner D1 Hydro an excellent choice for both small-scale and large-scale mining farms.
Another noteworthy advantage of this miner is its versatility. While it is optimized for Litecoin and Dogecoin, it can also mine a wide range of other Scrypt-based cryptocurrencies. This flexibility allows miners to pivot their operations in response to market trends, thereby maximizing profitability and minimizing risks. Coins such as Auroracoin (AUR), Goldcoin (GLC), and PepeCoin (PEP) are also supported, giving users a diverse range of options.
The D1 Hydro operates with a noise level of 50 dB, which is considerably lower than many of its competitors. This is particularly appealing for miners looking to maintain a quieter workspace or for those operating in environments where noise pollution is a concern.
In conclusion, the VolcMiner D1 Hydro sets a new standard for Scrypt-based mining. Its innovative hydro-cooling system, exceptional hashrate, and energy efficiency make it an ideal choice for those seeking reliable, high-performance equipment. Whether you’re focused on Litecoin, Dogecoin, or other Scrypt-based coins, the VolcMiner D1 Hydro is a versatile and powerful tool that can take your mining operation to the next level.
Specifications of VolcMiner D1 Hydro
Manufacturer | VolcMiner |
Model | D1 Hydro (30.4Gh) |
Release | Feb 2025 |
Size | 440 x 90 x 730mm |
Weight | 29500g |
Noise level | 50db |
Cooling | Hydro cooling |
Power | 7600W |
Voltage | 170-300V |
Rack format | 2U |
Interface | Ethernet |
Temperature | 5 – 45 °C |
Humidity | 10 – 90 % |
First of all, thank you for your interest and support to X-ON MINING. In order to avoid misunderstandings in the process of purchasing a miner, please read all the following notes carefully before placing your order. Thank you very much for your understanding!
1 – Given the specific dynamics of the miner market, when we receive your payment, the miner’s price may have changed and we may need to refund your order.
We use batch processing for all mining machine orders, and the quantity of each batch is very limited. Even if the same type of mining machine, different batches of mining machine prices are not the same. They’re selling fast. Given the highly variable market and demand, the prices of stock miners may vary from day to day. Therefore, so there is a possibility that by the time we receive your payment, the price of the mining machine has gone up and we need to refund your order.
2 – About stock miners
The delivery date of stock asic miner is 3-7 working days. Once we receive your order, we will immediately notify our technical center staff to test the machine you ordered to make sure it works well. We’ll also send you a video for confirmation. We will send the machine to you only after we confirm that all the properties of the machine are correct. Then, we will give the machine to our freight forwarder. We will update the waybill number on our website and you will receive a detailed email.
3 – About pre-purchase miners
The actual delivery date of the pre-ordered miner depends on the miner delivery date of the factory. We will indicate on the order page the estimated delivery month of the pre-ordered miner for your consideration. However, there may still be a delay in delivery. First, if the factory delivery date is delayed, then the delivery of the X-ON MINING Mining machine will also be delayed. It is also possible that the plant will not be able to produce the mining machine within the expected time, in which case we will process your order for a refund.
Reviews
There are no reviews yet.